“Richco provided an excellent product that was quick and easy to apply”

“Our Decking Strips were delivered on time and just as Richco said, they were very easy to install”

High Build Epoxy Floor Coating

Specifications

Area Coverage
Coverage area is approximately 18m² per 4.5L per coat. One coat is normally sufficient depending on the quality of existing substrate.

Curing Time
This product will normally cure overnight at 15 °C to accept light foot traffic the next day. Full chemical and wear resistance is achieved over 7 days (at a minimum constant temp of
15 °C). Water should not be allowed to lie on the surface for at least 7 days. Avoid washing the surface for 7 days after coating.

Surface Preparation
Concrete and brick: Concrete to be treated must be dry, at least four weeks old and free of any soft surface laitance, contaminants, and not subject to rising damp. All loose material should be removed. Very smooth bare concrete or concrete with soft surface laitance should be etched and the area thoroughly hosed off and allowed to dry. Grease or oil should be removed with a degreasant and the area thoroughly hosed off and allowed to dry. Very smooth previously painted surfaces should preferably be abraded to improve adhesion. Steel: Remove loose or flaking material, rust and any previous coatings by wire brushing or disc grinding to achieve a bright surface. Oil or grease should be removed with a degreasant and the metal then washed with Water and allowed to dry. Coating should be carried out immediately providing flash rusting has not occurred.

Priming
A primer is not generally required, epoxy resin coatings can bubble if applied direct to open textured or very porous surfaces. We recommend one coat a 4 Hour Epoxy Primer for such surfaces.

Mixing
The curing agent and resin must be very thoroughly mixed together with a wide bladed tool until an even colour is obtained.

Application
Best results are obtained in warm conditions (minimum 15°C). On horizontal surfaces apply by medium pile type roller in one coat. On vertical surfaces two thin coats are recommended. The second coat should be applied within 24 hours.

Application Tools
Apply Richco High Build Epoxy Floor Coating using a medium type pile roller. Mix product with a wide bladed tool.

Cleaning of Application Tools
It is not practical to clean applicators and they should be discarded after use.