Specifications
Area Coverage
Coverage area is approximately 1m² per 50kg at 30mm thick.
Curing Time
Richco Deep Fill Concrete Repair will normally cure in 3 - 6 hours depending on temperature. Repairs will be ready for heavy traffic in 8 - 12 hours. Curing will be very slow or even arrested by temperatures of 10°C or below.
Surface Preparation
Surfaces should be clean, dry and free of all loose material.
Wire brushing or sweeping is generally sufficient. A degreaser can be used to remove grease and oil.
Priming
A primer is not usually required.
Application
Trowel firmly against the surface to be repaired, and finish
with a trowel or float. To prevent drag on the trowel,
moisten a rag with white spirit and wipe it across the blade
which will allow you to create a smooth finish.
Application Tools
Apply Richco Deep Fill Concrete Repair using a trowel.
Cleaning Application Tools
Equipment used for applying Richco Deep Fill Concrete Repair should
be wiped clean with white spirit or a similar solvent
before the concrete cures.
