Specifications
Area Coverage
Coverage area is approximately 25m² per coat per 5L. One coat is generally sufficient.
Drying Time
Richco Factory Wall Coat will generally be touch dry after 12 hours at 15°C. Low temperatures can extend the drying time.
Surface Preparation
A minimum of surface preparation is necessary, but contaminants
and any loose material should be removed. Surfaces which are
loose and friable or very porous should be primed with a 50%
dilution of Richco Factory Wall Coat with water.
Application
Richco Factory Wall Coat is best applied in one thick coat
with a paint brush. A roller and frame may be
used, but as it applies the Factory Wall Coat more sparingly,
a second application may be necessary.
Application Tools
Apply Richco Factory Wall Coat using a brush or roller.
Cleaning of Application Tools
Applicators should be cleaned with warm soapy water before the product has cured.